White Hart Lane

White Hart Lane

VolkerGround Engineering was awarded a £100,000 contract by Modebest to support the works at White Hart Lane, London.

Using an ABI 14/17 VSL leader rig and a 20VV hammer the team installed temporary sheet piles to enable the construction of a new housing development.

The team utilised the new technology of the ABI 14/17 VSL leader rig to carry out soil loosening in order to install the temporary sheet piles into hard clay.

Design was undertaken by VolkerGround Engineering’s in-house specialists. The team designed a solution which enabled the main contractor to step the formation levels on the sloping site.

The team’s contribution to the White Hart Lane project is one of many examples of VolkerGround Engineering winning further contracts because of client satisfaction and its strong reputation. VolkerGround Engineering has now provided Modebest with its engineering expertise on numerous projects in and around the London area.